Xiajiang

Xiajiang hydraulic project locates on the middle part of Gan river, named Xiajiang. It is mainly for flood control and power generation.

 Operator :  China power investment corporation
 Operation :  2013-2015
 Type :  Storage power plant
 Total Power :  324 MW

 

 

 

Prototype characteristics

Max. Head = 8.6 m
Rotation speed = 71.40 rpm
Runner diameter = 7.7 m
Power = 9×36 MW
Scale model ratio = 19.25