  • LMH/608
    Development test and witness test for the Francis turbines of Upper Gotvand hydro project in Iran. Contract awarded by TUBA Co. Ltd, Republic of Iran.
  • LMH/623
    Development and acceptance test for the Francis turbine of Imatra hydro project in Finland, contract awarded by Andino, France.
  • LMH/638/639/640/642/643
    Competitive tests for the new runners of Kaplan Turbines of PRIEST RAPIDS (10 x 86 MW). Contract awarded by Public Utility District N°2 of Grant County, Washington state, USA.
  • LMH/635
    Development test and witness test for the Francis turbines of Chavantes hydro project in Brazil. Contract awarded by Voith Hydro York, USA.
  • LMH/633
    Official Witness Test for a Francis type pump-turbine for Xianju in China, contract awarded by HARBIN. China.
  • LMH/646
    Development test and witness test for the Francis turbines of Salto Santiago hydro project in Brazil. Contract awarded by Voith Hydro York, USA.
  • LMH/647
    Research test for the European Project Hyperbole made on the Francis turbines model of Mica 1 and 2.
2012
  • LMH/615
    End of development test for the Francis turbines of Belo Monte hydro project. Contract awarded by Alstom Grenoble, France.
  • LMH/616
    Development and acceptance Test for a Francis turbine, contract awarded by GEPPERT, Austria.
  • LMH/617
    End of the development tests for the new Francis turbine runner for Huoi Quang hydro project. Contract awarded by Alstom Grenoble, France.
  • LMH/627
    Development and acceptance tests for the Francis turbine runner for Hoover 8 hydro project. Contract awarded by Voith York, USA.
  • LMH/628
    Acceptance tests for the Francis turbine runner for Artvin hydro project. Contract awarded by Alstom Grenoble, France.
  • LMH/622/626/629/632
    R&D for a Kaplan type turbine, contract awarded by Alstom Grenoble, France.
  • LMH/613/614
    Official Witness Test for two Francis types pump and pump-turbine for Li Yang and Niu Lan Jiang, contract awarded by HARBIN. China.
  • LMH/630
    Official tests for the Bulb turbines of Chang Sha. Turbine manufacturer, ZHEFU Ltd. China. Contract awarded by the turbine manufacturer, Hangzhou, China.
  • LMH/601
    Official Witness Test for the Francis pump-turbines of SALAMONTE 2, contract awarded by EDP. Portugal.
2011
    • LMH/607
      Official Witness Test for the Francis turbines of WANETA expansion project (335 MW), contract awarded by Columbia Power. BC Canada. Turbine manufacturer, Voith Heidenheim, Germany.
    • LMH/605/611
      Comparative test and official witness tests between two different runner designs for the bulb turbines for Xia Jiang power plant (9 x 36 MW). Manufacturers: Alstom Grenoble, France and Dongfang Electric Machinery Ltd. China.
    • LMH/604
      Development tests for the new Francis turbine runner for Belo Monte hydro project. Contract awarded by Alstom Grenoble, France.
    • LMH/603
      Comparative test between the original and a new turbine runner designs for the refurbishment of the propeller turbines of the Otter Rapids power plant (4 x 46 MW) owned by Ontario Power Generation.
    • LMH/602
      Official Witness Test for the Francis pump-turbines of QINGYUAN (4 x 320 MW), contract awarded by TOSHIBA. Japan.
      • LMH/598/606
        Model construction, development and official Tests for the Bulb turbines of CANXI and TAOYUAN (25 MW). Turbine manufacturer, ZHEFU Ltd. China. Contract awarded by the turbine manufacturer, Hangzhou, China.
      • LMH/601
        Official Witness Test for the Francis pump-turbines of BAIXO SABOR JUSANTE (2 x 18 MW), contract awarded by EDP. Portugal.

 

2010
    • LMH/600
      Official Witness Test for the Francis pump-turbines of BAIXO SABOR MONTANTE (2 x 77 MW), contract awarded by EDP Produçao, Portugal.
    • LMH/597
      Development and Witness Test for a Francis pump-turbines for TOSHIBA, contract
    • awarded by TOSHIBA, Japan.

LMH/573
Development tests NKPS2 for a new Francis turbine runner for a small hydro project. Contract awarded by NIPPON KOEI, Fukushima, Japan.

  • LMH/576-577
    Model construction, development and official tests for the Bulb turbines of Jirau for Dongfang Electric Machinery, Andritz Hydro and Energia Sustentavel do Brazil
  • LMH/596
    Official and witness tests for the Francis pump-turbines of XIANYOU for Dongfang Electric Machinery, China
  • LMH/592-593
    Competitive tests for Francis turbine for GMS for BC Hydro, Canada
  • LMH/571-572
    Competitive tests for Francis turbine for LG2 for Hydro Quebec, Canada
  • LMH/594
    Witness tests for the Francis turbine of MICA for BC Hydro, Canada
2009
  • LMH/570
    Model construction, development and official tests for the Kaplan turbines of Banduo for ZHEFU, China
  • LMH/580
    Official Test of a Francis turbine for Xianyou for Dongfang Electric Machinery, China
  • LMH/579
    Official Test of a Francis turbine for Xian Shui Jan for Harbin Electric Machinery, China
  • LMH/567
    Official test of a Francis turbine for the Bemposta 2 power plant for Electricitad de Portugal and ANDRITZ HYDRO GmbH, Germany
  • LMH/561
    Development and official tests for the propeller turbines of Harmon for Ontario Power Generation, Canada and ALSTOM, France
  • LMH/560
    Development and official tests for the propeller turbines of Little Long for Ontario Power Generation, Canada and ALSTOM, France
  • LMH/557,574,575,585
    Baseline tests for the Kaplan turbines of Priest Rapids for Public Utility District No2 of Grant County, Washington, US
2008
  • LMH/565
    Official Test of a Francis turbine for Picote 2  power plant for Electricitad de Portugal and Voith-Siemens, Gernany
  • LMH/564
    Official Test of a Francis turbine for Nuo Zha Du power plant for HUANENG LANCANGJIANG, China and Voith-Siemens, Gernany
  • LMH/563
    Official Tests of Kaplan turbine of Estreito power plant for CESTE Brazil and Voith-Siemens, Germany
  • LMH/553
    Development tests of a Francis turbine runner for a small hydro project for NIPPON KOEI, Japan.
  • LMH/552,566
    Research and development tests for a series of very high head pump-turbines for ALSTOM Hydro, France
  • LMH/535
    Comparitive tests between 3 different runner designs for the refurbishment of the Kaplan turbines of Djerdap for Hidroelektrane Djerdap, Serbia
2007
  • LMH/551
    Official Tests of Kaplan turbine of Sao Salvador for GE Hydro and CESS Brazil
  • LMH/550
    Official Tests of Francis turbine of Revelstocke for Voith-Siemens, Germany and BC Hydro, Canada
  • LMH/549
    Development Tests for F-NX (severa Chinese projects) for Voith-Siemens, Germany
  • LMH/548
    Acceptance Tests for Foz de Chapeco for ALSTOM, France
  • LMH/546
    Development and Official Tests for SIR ADAM BECK 1 for American Hydro and Ontario Power Generation
  • LMH/543
    Validation Tests: Development and Official Tests for the Francis pump-turbines of Dong Qing for ALSTOM, France
  • LMH/501-504
    Research and development tests for a series of pump-turbines for ALSTOM, France
2006
  • LMH/534
    Competitive Model Test for Tocoma for GE Hydro
  • LMH/533
    Competitive Model Test for Tocoma for IMPSA
  • LMH/531,540
    Development and Official Tests of a Francis Turbine DES JOACHIMS for American Hydro Corporation
  • LMH/530
    Development Official Tests of a Francis Turbine ZAKUCAC for ALSTOM
  • LMH/529
    Development and Official Tests of a Kaplan Turbine
  • LMH/528
    Development and Official Tests of a Pump-Turbine Rocky Mountain for American Hydro Corporation
2005
  • LMH/508-509
    Contractual competitive tests for the new Francis turbines of GURI 2 (10 x 770 MW). Contract awarded by EDELCA (Electrification Del Caroni C.A.), Caracas, Venezuela. New runner designer:

    • ABB ALSTOM Power, Grenoble, France.
    • VATECH Escher Wyss, Zürich, Switzerland.
  • LMH/503
    Acceptance Tests for refurbishment of Bulb Units LOWER OLT fo Voith Siemens Hydro Power
  • LMH/507
    Validation Tests: Development and Official Tests for the Kaplan Turbines of XI XIA Yuan for GE Hydro Canada
  • LMH/505
    Validation Tests: Development and Official Tests for the Francis Turbines of Glen Canyonfor US Bureau of Reclamation
2004
  • LMH/505
    Validation Tests: Development and Official Tests for the Francis Turbines of Glen Canyonfor US Bureau of Reclamation
  • LMH/502
    Validation Tests: Development and Official Tests for the Francis Turbines of Glen Canyon for US Bureau of Reclamation
  • LMH/496
    Development and acceptance tests of (355 MW) Francis turbine manufactured by Alstom Power for Peng Shui Project in China.
  • LMH/491
    Developments tests of emergency gate for Landsvirkjun Karahnjukar Complex in Iceland.
  • LMH/485
    Acceptance tests Brilliant Expansion Project with 1x 130 MW Kaplan turbine. The model is manufactured by Alstom Power
  • LMH/478-479
    Competitive model tests for Xiaowan Project in Yunnan Province, China (6x 714 MW Francis turbines). The models are manufactured by Voith Siemens and Ge Hydro Canada
2003
  • LMH/477
    Acceptance tests for Cougar Power station, with 15,2 MW Francis turbine manufactured by GE Hydro Canada
  • LMH/474
    R & D with 3 propellers turbines for GE Hydro Canada
  • LMH/472
    The acceptance tests on the refurbished turbine model of the Hydro-Electric Power Plant Portile de Fier II – HPP Djedap II (Yugoslavia) are performed in the Laboratory for Hydraulic Machines of EPFL.
  • LMH/471
    Cheongsong Pumped Storage Power Plant is situated in the South Korea, Republic of Korea, in the Region of Kyongsang-Bukto.The contract is awarded by Korea Western POWER COMPAGNY.
  • LMH/470
    BEIJING, Jan 17 Asia Pulse – Construction of the Xiaoxia Hydropower Station in Northwest China’s Gansu Province has officially started, according to official Sources. The Station will be the 10th China Plans to construct in the Section from Longyangxia to Qingtongxia on the upper reaches of the Yellow River. It is the second Hydropower Project undertaken by the Xiaosanxia Hydropower Development Co., Ltd. The Station is designed to have an installed Capacity of 230MW and is expected to generate 956 million kWh of electricity a Year. Total investment is estimated at 1.5 billion yuan. The first generating unit is expected to go into operation in 2004 and the whole Project will be completed in 2005. (XIC)
2002
  • LMH/464
    Acceptance test for the remplacement of Propeller turbines for the Powerplant of CHATS FALLS (4 x 28 MW). Contract awarded by ONTARIO POWER GENERATION. The model is manufactured by ALSTOM POWER Hydro.
  • LMH/461
    Performance test with the model of (7 x 124 MW) Francis existing runner for MANAPOURI Powerplant in New Zealand. The owner is Meridian Energy and the model including existing runner is manufactured by EPFL-LMH.
  • LMH/459
    Low head Francis turbine, R & D model test. ALSTOM POWER Hydro.
2001
  • LMH/456-458
    Acceptance test for the new Francis turbines of GM Shrum (3 x 290 MW). Contract awarded by British Columbia Hydro, Canada. The new and the existing runner are designed by GE Hydro.
  • LMH/454
    Development test for the replacement of Francis runners (3 x 41 MW) for the project MARTIN DAM awarded by Alabama Power. The designer is GE-Hydro.
  • LMH/4452-453
    R&D test of Francis runner (3 x 102 MW) for the project of JIANG YA owned by Linshui Compagny. The hydraulic design is made by GE-Hydro.
  • LMH/451
    Acceptance test of Pump-Turbine (2 x 97.5 MW) for the project of VENDA NOVA II – Portugal. Contract awarded by Hidrorumo. Manufactured by VOITH SIEMENS Hydro Power Generation.
2000
  • LMH/434,444-450
    Acceptance test for the remplacement of Francis runner (51 MW) for the project CHUTE A LA SAVANE awarded by ALCAN, Canada.
  • LMH/432-443
    Contractual competitive tests for the new Francis turbines of GURI 2 (10 x 770 MW). Contract awarded by EDELCA (Electrification Del Caroni C.A.), Caracas, Venezuela. New runner designer:

    • VOITH Hydro, York, USA.
    • ABB ALSTOM Power, Grenoble, France.
    • VATECH Escher Wyss, Zürich, Switzerland.
    • GE Hydro, Trondheim, Norway.
1999
  • LMH/426
    Contractual manufacturer tests for the new Francis turbines of KOZJAK (2 x 40 MW). Contract awarded by ABB-ALSTOM, customer, HAINAN S.I.T. ENTREPRISE CORP. Beijing and ELECTRIC POWER COMPANY OF MACEDONIA.
  • LMH/425-427-429-435-436
    Development tests and contractual manufacturer tests for the replacement Francis turbines runners of GARRISON (5 x 109.25 MW). Contract awarded by ABB-ALSTOM, customer, US Army Corps of Engineers, Portland District, USA.
  • LMH/423
    Contractual reception tests for the new Francis pump-turbines of ALQUEVA (2 x 113.4 / 129.6 MW). Contract awarded by HIDRORUMO, customer, Empresa de Desenvolvimento e Infra-estrutura do Alqueva, S.A. and ALSTOM Hydro Grenoble, France.
  • LMH/392-393
    408-409, Contractual competitive tests for the new Francis turbines for the project of GRAND COULEE (18 x 125 MW) awarded by US Department of Interior of the US Bureau of Reclamation, Denver, USA. New runner designer:

    • VOITH Hydro, York, USA.
    • GE Hydro, Montréal, Canada.
    • AMERICAN Hydro, York, USA.
    • ALSTOM Hydro Tracy, Canada.
1998
  • LMH/420
    Contractual test of the existing Francis turbines of AKOSOMBO. Contract awarded by VOLTA RIVER AUTHORITY, Accra, Ghana, in collaboration with ACRES International Inc. Niagara falls, Canada.
    Original model runner manufactured by IMHEF.
  • LMH/405-415
    Contractual competitive tests for the new Francis turbines of AKOSOMBO (6 x 174 MW). Contract awarded by VOLTA RIVER AUTHORITY, Accra, Ghana, in collaboration with ACRES International Inc. Niagara falls, Canada. The new turbines are designed by:

    • SULZER Hydro, Zürich, Switzerland.
    • GE-Canada/Voest-Alpine.
  • LMH/407
    Comparison tests between three different distributors for KOOTENAY CANAL, Francis turbines (4 x 147.6 MW). Manufacturer, ALSTOM Neyrpic. Contract awarded by British Columbia Hydro, Canada.
  • LMH/398, 416-419, Competitive tests of Francis turbine for the project of SHIPSHAW. Contract awarded by ALCAN, Canada. The model with existing runner are manufactured by IMHEF. The new runners are designed by:
    • GEC-ALSTOM.
    • GE-Canada.
  • LMH/411
    Additional test for WANETA GS Francis turbines (3 x 130 MW) owned by COMINCO. The runner design is made by American Hydro, USA and the model manufactured by IMHEF.
  • LMH/396
    Contractual tests for the Francis turbine of ST.MARGUERITE 3 (2 x 440 MW) Contract awarded by Hydro Québec, Canada. The turbines are manufactured by GE Canada.
1997
  • LMH/402-403
    Development tests for the project of WANETA GS Francis turbines (3 x 130 MW) owned by COMINCO. The runner design is made by American Hydro, USA and the model manufactured by IMHEF.
  • LMH/397
    Contractual tests for the Francis turbines of SHIPSHAW. Contract awarded by ALCAN, Canada. The new runner were designed by ALSTOM Neyrpic and the model manufactured by IMHEF.
  • LMH/391
    Contractual tests for the Francis turbine of REVELSTOKE (1 x 500 MW). Contract awarded by British Columbia Hydro, Canada. The turbine is manufactured by GE Canada.
  • LMH/382-389; LMH/399-401, Development tests of a pump-turbine for TAUM SAUK owned by UNION ELECTRIC COMPANY St Louis, Missouri. Contract awarded by American Hydro, USA.
    Model manufactured by IMHEF
  • LMH/381
    Development and contractual tests for the Francis turbines of BATMAN in Turkey (3 x 67 MW). Contract awarded by Preussag NOELL, Switzerland.
  • LMH/380
    LMH/394, Comparison and contractual tests for CHUTE DES PASSES, replacement runners of Francis turbines. Original runner made by IMHEF, new runner designed by ALSTOM Neyrpic. Contract awarded by ALCAN, Canada.
    Original model runner manufactured by IMHEF.
  • LMH/377
    Post development tests for the Francis turbines of BOUNDARY. Contract awarded by Preussag NOELL, Switzerland.
1996
  • LMH/377
    Development tests for the replacement runners of BOUNDARY (4 x 168 MW) Francis turbines owned by SEATTLE CITY LIGHT, USA. Contract awarded by Preussag NOELL, Switzerland.
  • LMH/375 -376
    Comparison and contractual tests for KIPLING replacement runners of propeller turbines. Original runner made by IMHEF, new runner designed by. ALSTOM Neyrpic Contract awarded by Ontario Hydro, Canada and the original model runner manufactured by IMHEF.
  • LMH/372 -373
    Comparison tests between three different sets of guide wanes for ISLE MALIGNE, Francis turbines (10 x 40 MW). Manufacturer, Voith Hydro. Contract awarded by ALCAN, Canada.
    Model manufactured by IMHEF.
  • LMH/368
    Comparison and contractual tests for BEAUHARNOIS replacement runners propeller turbines (9 x 55 MW). Test of the original and new runners manufactured by ALSTOM Neyrpic. Contract awarded by Hydro Quebec, Canada. The original model runner is manufactured by IMHEF.
  • LMH/367
    Comparison and contractual tests for BEAUHARNOIS replacement runners Francis turbines (6 x 45 MW). Test of the original and new runners manufactured by GE Hydro Canada. Contract awarded by Hydro Quebec, Canada. The original model runner manufactured by IMHEF.
  • LMH/359
    Comparison tests for an internal project of a pump – turbine. Contract awarded by Toshiba, Japan.
1995
  • LMH/369 -370
    Development tests for BEAUHARNOIS Francis turbine. Contract awarded by GE Hydro, Canada.
    Original model runner manufactured by IMHEF.
  • LMH/363 -366
    Comparison and contractual tests for PINE PORTAGE GS , replacement runners Francis turbines (2 x 31.3 MW). Test of the original and new runners manufactured by GE, Canada. Contract awarded by Ontario Hydro, Canada.
    Original model runner manufactured by IMHEF.
  • LMH/361
    Contractual tests for WANETA GS Francis turbines (3 x 117 MW) owned by COMINCO. Contract awarded by American Hydro, USA. Model manufactured by IMHEF.
  • LMH/358, LMH/362
    Comparison and contractual tests for CHUTE DU DIABLE replacement runners Francis turbines (4 x 48.4 MW). Test of the original and new runners manufactured by SULZER Hydro. Contract awarded by ALCAN, Canada.
  • LMH/360
    Comparison tests for an internal project of a Kaplan turbine. Contract awarded by Toshiba, Japan.
  • LMH/354
    R & D test for the project of RUACANA Francis runner designed by VOEST-ALPINE.
  • LMH/341
    R & D test of Francis turbine (230 MW) for the powerplant of MANIC V PA. Contract awarded by EDF and Hydro-Québec. The model is made by IMHEF.
1994
  • LMH/348-349
    Development tests for WANETA GS Francis turbines (3 x 117 MW) owned by COMINCO. Contract awarded by American Hydro, USA. Model manufactured by IMHEF.
  • LMH/352
    First comparison tests for the original runner of CHUTE DES PASSES Francis turbines (5 x 160 MW). Contract awarded by ALCAN, Canada. Model and original runner manufactured by IMHEF.
  • LMH/351
    Contractual tests for BERKE DAM Francis turbines (3 x 171.5 MW). Manufacturer, ALSTOM Neyrpic. Contract awarded by Cukurova Electrik A.S., Turkey.
  • LMH/350
    Contractual tests for KOYNA 4 Francis turbines (4 x 316,5 MW). Manufacturer, ALSTOM Neyrpic. Contract awarded by State of Maharashtra, India.
  • LMH/344 -347
    Comparison and contractual tests for SIR ADAM BECK II GS, replacement runners, Francis turbines (16 x 78.3 MW). Test of the original and new runners manufactured by ALSTOM Neyrpic. Contract awarded by Ontario Hydro, Canada. Original model runner manufactured by IMHEF.
  • LMH/342-343
    Development tests for a Francis turbine for the ERTAN project in China. Contract awarded by GE Hydro Canada.
1993
  • LMH/339
    Development tests for a new type of turbine TIAC. NEFF research contract.
  • LMH/338
    Evaluation of an ultra sonic flowmeter. NEFF research contract.
1992
  • LMH/334-335
    Comparison and contractual tests for KOOTENAY CANAL, replacement runners Francis turbines (4 x 147.6 MW). Manufacturers: ALSTOM Neyrpic and Voith Hydro. Contract awarded by British Columbia Hydro, Canada.
  • LMH/332
    R&D test of a Francis turbine (128 MW) for the powerplant of SAUCELLE/HUEBRA awarded by Ateliers de Construction Mécanique de Vevey, ACMV.
  • LMH/329-331
    Development test of Propeller turbine (20 MW) for the project of CHENAUX GS. Turbine runner designed by GE Canada Dominion Engineering Works (DEW). Owner Ontarion Hydro.
  • LMH/328
    Acceptance test of Kaplan turbine (39 MW) for the project of GABRIEL TERRA. Contract awarded by UTE Aprovechamiento Hidroeléctrico del Rio Negro, Urugay. New runner designed by GEC ALSTOM NEYRPIC.
  • LMH/327
    Acceptance test of Kaplan turbine (2 x 230 MW) for the project of SHUIKOU. Contract awarded by Bureau of Electric Power Fujian Province (BEPFP). Design made by HITACHI Ltd., Japan.
  • LMH/321-326
    Acceptance test of Propeller turbine (19 MW) for the project of CHENAUX GS. Contract awarded by ONTARIO HYDRO, North York, Canada. Design made by Sulzer Escher Wyss.
1991
  • LMH/318 -319
    Acceptance test of Propeller turbine (8 x 65 MW) for the refurbishing project of R.H.SANDERS GS, St-Laurence River, Cornwall, Ontario. Contract awarded by Ontario Hydro, Canada. Comparison of existing runner with new runner designed by DBS Escher Wyss INC.
1990
  • LMH/317
    R&D test of a Francis turbine (128 MW) for the powerplant of SAUCELLE/HUEBRA awarded by Ateliers de Construction Mécanique de Vevey, ACMV.
  • LMH/309
    Acceptance test of Francis turbine (6 x 142 MW) for the project of LA FORGE 1 awarded by SOCIETE D’ENERGIE DE LA BAIE JAMES (SEBJ), Canada. Design made by MIL-Neyrpic, Canada.
  • LMH/308
    Acceptance test of Propeller turbine (8 x 118 MW) for the project of LA GRANDE 1 awarded by SOCIETE D’ENERGIE DE LA BAIE JAMES (SEBJ), Canada. Design made by DEW-Canada.
  • LMH/307
    Acceptance test of Propeller turbine (4 x 116 MW) for the project of LA GRANDE 1 awarded by SOCIETE D’ENERGIE DE LA BAIE JAMES (SEBJ), Canada. Design made by MIL-Neyrpic, Canada.
1989
  • LMH/305
    Acceptance test of Pump-Turbine (4 x 306 MW) for the project GUANGZHOU 1 awarded by joint venture corporation (GPSJVC), China. Design made by SULZER-HYDRO and NEYRPIC.
  • LMH/302-304
    Contractual competitive test for th replacement of Francis turbine (13 x 204 MW) for ROBERT MOSES NIAGARA Powerplant awarded by NEW YORK POWER AUTHORITY (N.Y.P.A.). The new turbine designed are made by:

    • DBS ESCHER WYSS.
    • VOITH Hydro, York.
    • VOEST ALPINE.
1988
  • LMH/298
    Acceptance test of Francis turbine (3 x 93 MW) for the project of SIR DAM awarded by CUKUROVA ELECTRIK A.S. ADANA, Turkey. Design made by HITACHI, Japan.
1987
  • LMH/295
    R & D test of Kaplan turbine. Design made by Ateliers d’Ingénerie Dominion, DEW.
  • LMH/293-294
    Acceptance test of Francis turbine for the project of RAPIDE DES QUINZE, region Abilibi, Canada. Design made by Ateliers d’Ingénerie Dominion, DEW.
1986
  • LMH/289
    Acceptance test of Francis turbine (2 x 317 MW) for the project of ALTO LINDOSO. Contract awarded by ELECTRICIDADE DE PORTUGAL. Design made by NEYRPIC, France.
  • LMH/284-288
    Competitive test of Francis turbine (36 MW) for the project of ISLE MALIGNE awarded by ALCAN, Canada. design made by ALLIS-CHALMERS, SULZER ESCHER WYSS.
1985
  • LMH/279-282, LMH/290
    R & D test of Francis turbine for the project of LA GRANDE 3, Canada. Design made by NEYRPIC, Grenoble, France.
  • LMH/266
    Development test of Bubble turbine for the project of FELSNAU, Suisse. Design made by SULZER ESCHER WYSS.
  • LMH/277-278
    Acceptance test of Kaplan turbine for the refurbishing project of WELLS DAM. Contract awarded by Bechtel for Public Utility District No.1 of Douglas County, Washington. Design made by Fuji Electric Co, Ltd, Japan and Voest-Alpine AG.
  • LMH/276
    Acceptance test of Francis turbine (8 x 306 MW) for the project of ATATURK awarded by DEVELET SU ISLERI (DSI), Turkey. Design made by SUZER ESCHER WYSS, Switzerland.
1984
  • LMH/249
    Acceptance test of Pump-Turbine (2 x 74 MW) for the project of TORRAO awarded by ELECTRICIDADE DE PORTUGAL. Design made by SOREFAME-NEYRPIC.
1981-1982
  • LMH/265
    Acceptance test of Kaplan turbine (18 x 103 MW) for the project of PORTO PRIMAVERA awarded by COMPANHIA ENERGETICA DE SAO PAULO, Brazil. Turbine manufactured by MECANICA PESADA-NEYRPIC.
1979
  • LMH/228
    Acceptance test of Francis turbine (8 x 254 MW) for the project of LA GRANDE 4 awarded by SOCIETE D’ENERGIE DE LA BAIE JAMES (SEBJ), Canada. Design made by MARINE INDUSTRIE, Canada.
  • LMH/223
    Acceptance test of Francis turbine (18 x 715 MW) for the project of ITAIPU, Brazil. Contract awarded by CONSORTIO ITAIPU ELETRO MECANICO (CEIM), Germany-France-Switzerland-Brazil.